The Application for Connection forms allow the Port of Seattle to assess the impacts of additional services/loads on airport systems, identify the point of connection, reserve the point of connection for approved service/loads, establish and maintain configuration control of the system, and plan for long-term system development to meet the needs of STIA. An approved application for connection is required before any connection or installation to a utility system is made.
Communications Systems
Application to connect to all communications infrastructure other than radio frequency (excludes tenant-owned infrastructure in tenant-leased spaces that are not connected to Port-owned infrastructure or routed through Port-owned spaces)
Electrical Systems
Application for connections, load additions, or modifications to the airport electrical distribution, lighting, or emergency power systems
Industrial Waste Systems
Application for connections, load additions or modifications to the Industrial Wastewater System at STIA
Mechanical Systems
Application for connections, load additions or modifications to airport mechanical systems including heating/ventilation/air conditioning (HVAC), chilled water, hot water and condenser water systems
Natural Gas System
Application for connections, load additions (MBH, CFH), or modifications to the STIA gas distribution system to CTE, B or C Concourse, or the North Satellite. (A and D Concourse gas is obtained directly from Puget Sound Energy).
Radio Frequency Systems Application
Sanitary Waste Systems
Application for connections, load additions or modifications to the STIA sanitary waste system
Storm Drain Systems
Application for connections, load additions, or modifications to the STIA storm drainage system
Water Systems
Application for connections, load additions, or modifications to the STIA water distribution system including irrigation, domestic water and fire suppression
This group of documents describe design guidelines that should be followed for any airport project. (Documents are Microsoft Word.doc and AutoCAD.dwg files compressed in ZIP format, and range in size up to 97Mb.) All downloadable files are available on CD-ROM; if you do not have a high-bandwidth connection to the Internet, or prefer to receive the files on CD-ROM, ask your project manager for a copy.
Regulations for Airport Construction 2004
Compendium of procedures, rules, regulations and standards to be followed for all Port and tenant projects that are constructed at STIA. These regulations focus primarily on the construction phase, with separate design guidelines and standards addressing design requirements (see this and the following section). (1Mb)
Design Guidelines 2001
Describes the comprehensive vision for design criteria at STIA (3.2Mb)
Concessions Design Guidelines
Guidelines for concessions design and material selection at STIA (18 Mb)
Landscape Design Guidelines 1999
Guidelines for landscape design and installations at STIA (7.4Mb)
Port of Seattle Health & Safety Manual
Guide to contract safety requirements and the Port of Seattle Fire Department as it relates to construction
Document 0860 - Safety Management
Tenant document bidding requirements, contract forms and conditions of the contact (210 KB)
Interlocal Agreement City of SeaTac
This group of documents define design standards that must be followed for any airport project. (Documents are Microsoft Word or AutoCAD files compressed in ZIP format, and range in size from 1-33Mb.) All downloadable files are available on CD-ROM; if you do not have a high-bandwidth connection to the Internet, or prefer to receive the files on CD-ROM, ask your project manager for a copy.
Architecture Standards 2001
Standards for architectural design, materials and finishes selection at STIA (12Mb PDF)
CAD Standards 2008 (40 Mb)
Casework Standards 2003
Standards for casework design and material selection at STIA (23.7Mb)
Communications Systems Standards 2011
Standards for communication system design and equipment selection at STIA. Includes appendices for tenant guidelines and communications labeling standards. (5.3Mb)
Electrical System Standards 2012
Standards for electrical system design and equipment selection at STIA (10.2Mb)
Industrial Waste and Storm Drainage Systems Standards 2002
Standards for design and equipment selection for industrial waste and storm drain systems at STIA (1Mb)
Landscape Standards 2006 Standards for landscape design, installation, equipment selection and plant selection at STIA. (3.6Mb)
Mechanical Systems Standards 2003
Standards for mechanical system design and material selection at Sea-Tac Airport (3Mb)
Radio Frequency Standards 2005
Standards for radio frequency system design and equipment selection at STIA
Rental Car Facility (RCF) Tenant Design and Construction Standards 2012 (12Mb)
Design and construction standards for tenants of the consolidated rental car facility. These Standards are supplemental to existing Design Standards for the unique features of the rental car facility.
Signage Standards 2011
Standards for signage design, layout configuration, graphics, symbols, installation and material selection at STIA (31Mb)
Water and Sanitary Sewer Systems Standards 2003
Standards for domestic water and sanitary sewer system design, installation, and material selection at Sea-Tac Airport (1.8Mb)
How to Apply for a Permit
Instructions for filling out an application and building permit request
Preliminary Design Review Conference Meeting Procedures
Explanation of the Preliminary Design Review Conference meeting, and how to prepare for one
Schedule of Building Permit Fees
A table for calculating Building Permit and Plan Review fees
Schedule of Grading Permit Fees
A table for calculating Grading Permit fees
Special Inspection and Structural Observation Agreement
Requirements for identifying Special Inspectors and Observers
Rules for Obtaining a Construction Trailer Permit
Instructions for obtaining permission to use a construction trailer at the airport
Procedures for Temporary Structures on the Airfield
Guide for obtaining permission to set up a temporary structure on the airfield
Procedures on Deferred Submittals and Change Orders
Explanation of the process for making changes (change orders) and additions (deferred submittals) to a plan after initial plan approval