The Port of Seattle is conducting a pre-bid meeting for the 2021 Airfield Pavement Replacement project.

Description of Work

The overall objective of the work is to replace distressed and/or damaged pavements on runways and taxiways, aprons, and any other areas on the airfield that may cause or bring Foreign Object Debris (FOD) into the movement area; replace joint seal in areas of runways, taxiways and taxi lanes that are most problematic and/or missing; and replace infrastructure/utilities in proximity to pavement work areas.

Scope of Work
  • Flagging services
  • Transportation safety programs, government
  • Drainage project construction
  • Silt fence and other fabrics
  • Asphalt concrete crushing and grinding
  • Concrete crushing and grinding
  • Remediation and cleanup of contaminated buildings, mine sites, soil, or ground water
  • Site preparation and related construction activities
  • Asphalt Paving
  • Concrete Paving
  • Expansion joints
  • Dump Trucking
  • Ductile Iron Pipe & Castings

This is a federally funded project with a DBE goal. DBE firms are encouraged to attend. 

Date: December 14, 2020
Time: 2:00 - 3:00 p.m.
Location: Microsoft Teams (Online)
Join the meeting!

PortGen Workshops and other Diversity in Contracting events are subject to change -  We take seriously our responsibility to the safety, health, and well-being of our customers, employees, and broader community and are doing everything we can to limit the spread of COVID-19 at Port facilities while maintaining the critical work that we do. 

Back to Top