Salmon Bay Marina Docks D and E Replacement

This project preserves Port assets that are essential to maritime industry economic growth and efficiency through dock replacements and improvements.

Total cost

$8.9 million

Project Summary

  • Replacement of floating Docks D and E with new dock configuration permitted under the existing Master Use Permit (MUP)
  • Work includes demolition of existing docks, dredge of the area to 16-foot draft, and replacement of docks with 12-foot-wide concrete floating docks and steel sheet pile bulkhead

Estimated Completion Date

Q1 2023

Purpose

The Salmon Bay Marina site inspection report concluded existing docks have limited useful life remaining.

Century Agenda / Long-range Plan

  • Use our influence as an institution to promote small business growth and workforce development
  • Increase customer satisfaction

Business Plan Objectives

  • Maximize the use of docks to provide net income to the Port by providing functional, safe and reliable docks for current and prospective customers
  • Meet the needs of recreational and commercial moorage customers
  • Meet or exceed other future commercial operational boating operations